hh logo
Skip Links
Text Size
Text Bigger
Text Smaller
Last Updated
Wednesday, 28 November 2018
Roadworks

Joubert St X Figtree Rd - Unscheduled Urgent works

The road closure will take place from Friday 07.12.2018 until and including 21.12.2018

Please note that Intercon Engineering wishes to advise you that a Road closure will be put in place at Joubert St for the excavation and pipe maintenance. As a result, road and part of nature strip of Joubert St between Figtree Rd & Martin St will be closed for the works to take place. A Standard full road closure will be used to manage traffic and pedestrian activity, and permit safe vehicular and pedestrian thoroughfare along Joubert St.

The road closure will take place from Friday 07.12.2018 until and including 21.12.2018.


Powered by